| Project Name |
Facility |
Budget ($ US) |
Status |
| AAC - Ethyl Amine Plant |
Petrochemical |
150000000 |
SOI - Solicitation of Interest |
| AGOC - Expansion |
Refinery |
150000000 |
Bids Under Evaluation |
| AGOC - KJO - Expansion of Hout Crude Onshore Production Facilities |
Onshore Crude Production |
50000000 |
Bids Under Evaluation |
| AGOC - KJO - Expansion of Khafji Crude Onshore Production Facilities |
Oil |
100000000 |
Contract Awarded |
| AGOC - KJO - Expansion of Offshore Loading Facilities |
Offshore Gas Field |
20000000 |
EPC Contract Award |
| AGOC - KJO - Neutral Zone Desalination Plant |
Desalination Plant |
37000000 |
Construction |
| AGOC - KJO - Renovation & Expansion of South Jetty |
Offshore Platforms |
25000000 |
Construction |
| AGOC - KJO- Gas Lift Number 2 |
Offshore Oil / Gas Production |
200000000 |
EPC Bids Under Evaluation |
| ALAUJAIN (ALFASEL) - Propane Dehydrogenation (PDH) Plant |
Polyethylene & Polypropylene |
275000000 |
Construction |
| ARRIYADH DEVELOPMENT AUTHORITY - Riyadh Light Railway Project |
Railway |
200000000 |
ITB |
| DELTA - INNOVENE - Petrochemical Plant |
Petrochemical |
2000000000 |
PMC Bid Submission |
| GCCIA - GCC Power Grid (Saudi Arabia) - Phase 1 |
Power |
1095320000 |
EPC Contract Award |
| GULF FARABI PETROCHEMICAL CO - N-Paraffin & Linear Alkyl Benzene Plant |
N - Paraffin |
325000000 |
Construction |
| JANA - Epichlorohydrin & Chloralkali Plant (Project Hassad) |
Petrochemical |
|
Construction |
| KAYAN - Olefins - Ethane Cracker |
Petrochemical |
|
EPC Contract Award |
| KAYAN - Olefins - Ethylene Oxide and Ethylene Glycon (EO/EG) unit |
Petrochemical |
|
EPC Bids Under Evaluation |
| KAYAN - Olefins - Polyethylene Unit |
Petrochemical |
|
PMC Contract Award |
| KAYAN - Olefins Complex - Polypropylene Unit |
Petrochemical |
|
PMC Contract Award |
| KAYAN - Petrochemical Complex (Over View) |
Petrochemical |
8000000000 |
EPCM Contract Award |
| MAADEN - Port Ras Al Zour |
Utilities |
450000000 |
Prequalification |
| MAADEN - Al Zabirah Power Plant |
Power Generation |
800000000 |
Bids Under Preparation |
| MAADEN - Aluminium Smelter |
Aluminium Smelter |
1000000000 |
PMC Bid Submission |
| MAADEN - Ammonia Plant |
Ammonia |
280000000 |
EPC Prequalification |
| MAADEN - Development Overview |
Industrial Complex |
5000000000 |
PMC Bid Submission |
| MAADEN - Diammonium Phosphate |
Diammonium Phosphate Plant |
225000000 |
EPC Contract Award |
| MAADEN - Gold Mines |
Gold Mine |
|
Contract Awarded |
| MAADEN - Phosphoric Acid |
Phosphoric Acid Plant |
300000000 |
EPC Contract Award |
| MAADEN - Ras Az Zawr Power Plant |
Power |
|
Planning |
| MAADEN - Sulfuric Acid |
Sulfuric Acid |
250000000 |
EPC Contract Award |
| MARAFIQ - Expansion of Sea Water Cooling System |
Power |
100000000 |
Bids Under Evaluation |
| MARAFIQ - Jubail IWPP |
Power |
2500000000 |
Bids Under Evaluation |
| MARAFIQ - Utilities |
Offsites & Utilities |
|
Bids Under Preparation |
| NATPET - Teldene Yanbu Polypropylene Plant |
Petrochemical |
215000000 |
Construction |
| NCP - Petrochemical Complex |
Petrochemical |
3000000000 |
Detailed Engineering |
| NPIC - SAHARA - BASELL - Ethane Cracker / HDPE / LDPE Plant |
Ethane Cracker/MEG/Benzene/HDPE/LLDPE/PP |
1600000000 |
EPC Bids Under Preparation |
| NPPC - APPC - Propane Dehydrogenation and Polypropylene Plant |
Propane/Polypropylene |
550000000 |
Construction |
| PIF - MAADEN - Al Zabirah to Al Jalamid Railway Project |
Railway |
2800000000 |
EPC Bid Submission |
| PIF - North South Railway Project (NSR) |
Railway |
|
Prequalification |
| ROYAL COMMISSION - New Jubail Industrial Park West |
Infrastructural facilities |
|
Detailed Engineering |
| SABIC - IBN RUSHD - PET Conversion & De-bottlenecking |
Petrochemical |
150000000 |
FEED Awarded |
| SABIC - AR RAZI - Methanol Plant V |
Methanol |
450000000 |
Construction |
| SABIC - HADEED - Flat Production Facility Enhancement of Hot Strip Mill |
Steel Plant |
|
Construction |
| SABIC - HADEED - Flat Steel Production Plant |
Steel |
500000000 |
Contract Awarded |
| SABIC - IBN ZAHR - Polypropylene (PP) Plant |
Polypropylene |
800000000 |
EPC Contract Award |
| SABIC - IBN ZAHR - Propane Dehydrogenation (PDH) Plant |
Petrochemical |
|
PMC Bid Submission |
| SABIC - JUPC - Alpha Olefins |
Alpha Olefins |
125000000 |
Construction |
| SABIC - JUPC - Ethylene Glycol Plant |
Ethylene Glycol |
275000000 |
Construction |
| SABIC - JUPC - Ethylene Glycol Plant 2 |
Ethylene Glycol |
|
Construction |
| SABIC - NIGC - Yanbu Air Separation Plant |
Air Separation |
|
Construction |
| SABIC - PETROKEMYA - Cracker Expansion |
Ethane Cracker |
150000000 |
Feasibility Study |
| SABIC - PETROKEMYA - Vinyl Plant |
Vinyl Complex |
250000000 |
FEED Tendering |
| SABIC - Safco IV |
Production of Ammonia & Urea |
520000000 |
Commissioning |
| SABIC - SHARQ Expansion (Ethane Cracker Package) |
Ethane Cracker |
900000000 |
EPC Contract Award |
| SABIC - SHARQ Expansion (Ethylene Glycol Plant) |
Ethylene Glycol |
400000000 |
Construction |
| SABIC - SHARQ Expansion (HDPE / LLDPE Package) |
Polyethylene |
960000000 |
Construction |
| SABIC - SHARQ Expansion (Overview) |
Petrochemical |
2300000000 |
EPC Contract Award |
| SABIC - Yanbu United Petrochemical Complex (YANSAB) - BTX Unit |
Petrochemical |
300000000 |
EPC Contract Award |
| SABIC - Yanbu United Petrochemical Complex (YANSAB) - Ethane Cracker & Propylene Plant |
Ethylene Cracker |
1000000000 |
Construction |
| SABIC - Yanbu United Petrochemical Complex (YANSAB) - HDPE |
Petrochemical |
400000000 |
EPC Contract Award |
| SABIC - Yanbu United Petrochemical Complex (YANSAB) - LLDPE & PP |
Petrochemical |
900000000 |
Construction |
| SABIC - Yanbu United Petrochemical Complex (YANSAB) - Mono Ethylene Glycol (MEG) |
Ethylene Glycol |
840000000 |
Construction |
| SABIC - Yanbu United Petrochemical Complex (YANSAB) - Overview |
Petrochemical |
5000000000 |
Partially Awarded |
| SADAF - Styrene III |
Petrochemical |
350000000 |
EPC Bids Under Evaluation |
| SAHARA PETROCHEMICAL CO - PP & PDH Plant |
Polypropylene |
530000000 |
Construction |
| SAMREF - Low Sulfur Automotive Diesel Oil (LSADO) |
Refinery |
18000000 |
FEED |
| SASREF - Refinery Expansion |
Refinery |
300000000 |
Shelved |
| SASREF - Refinery Instrumentation System Upgrade |
Refinery |
90000000 |
Construction |
| SAUDI ARABIAN TEXACO - KOC - Stream Flood Facilities |
Water Treatement |
|
ITB |
| SAUDI ARAMCO - Abqaiq Plants Replace Pump Stations 4 & 5 |
Pumping Station |
25000000 |
Construction |
| SAUDI ARAMCO - Al Aqiq New Bulk Storage Plant |
Bulk Storage Plant |
40000000 |
. |
| SAUDI ARAMCO - Arabiyah-6 Jack Up Barge Replacement |
Barge |
79000000 |
. |
| SAUDI ARAMCO - BAPCO - New Arabian Pipeline |
Oil Pipeline |
|
FEED Awarded |
| SAUDI ARAMCO - Bulk Plant Expansion Program |
Bulk Storage Plant |
300000000 |
Bids Under Evaluation |
| SAUDI ARAMCO - East/West Pipeline EWG-1 |
Gas Pipeline |
28500000 |
EPC Contract Award |
| SAUDI ARAMCO - Eastern Province Bulk Plants Expansion |
Bulk Storage Plants |
200000000 |
Construction |
| SAUDI ARAMCO - Hawiyah Gas Plant Expansion |
Gas Processing |
400000000 |
LSTK Contract Award |
| SAUDI ARAMCO - Hawiyah NGL and Associated Gas Recovery Plant (HNRP) |
Gas Processing |
1100000000 |
Construction |
| SAUDI ARAMCO - Hawiyah NGL Phase 2 |
Field Development |
|
Feasibility Study |
| SAUDI ARAMCO - Hawiyah NGL Recovery Pipelines |
Natural Gas Pipeline for District Gas Network |
200000000 |
Partially Awarded |
| SAUDI ARAMCO - Hayil New Bulk Storage Plant |
Bulk Storage Plant |
44000000 |
On Hold |
| SAUDI ARAMCO - In Kingdom PMC (Small Scale Projects) |
Oil / Gas production |
|
Prequalification |
| SAUDI ARAMCO - Juaymah Gas Plant ESD & Auxiliary Systems Replacement |
Gas Processing |
22000000 |
Awaiting Budget Approval |
| SAUDI ARAMCO - Juaymah Gas Plant Expansion |
Gas Processing |
200000000 |
Construction |
| SAUDI ARAMCO - Juaymah NGL Plant Cogeneration |
NGL Plant |
150000000 |
Construction |
| SAUDI ARAMCO - Juaymah Wastewater Upgrade |
Wastewater Treatment Plant |
80000000 |
Tenders Issued |
| SAUDI ARAMCO - Jubail Export Refinery |
Refinery |
6000000000 |
PMC Contract Award |
| SAUDI ARAMCO - KGP (Khursaniyah Gas Plant) |
Offshore Oil / Gas Production |
4000000000 |
Construction |
| SAUDI ARAMCO - Khurais Central Processing Facilities |
Gas Processing |
1240000000 |
Contract Awarded |
| SAUDI ARAMCO - Khurais Crude Increment Development Program (Overview) |
Field Development |
4000000000 |
Partially Awarded |
| SAUDI ARAMCO - Khurais Downstream Pipelines |
Pipeline |
690000000 |
Construction |
| SAUDI ARAMCO - Khurais Residential & Industrial Complex |
Infrastructural facilities |
155000000 |
Bids Under Evaluation |
| SAUDI ARAMCO - Khurais Seawater Supply & Injection Facilities |
Water Injection |
980000000 |
Construction |
| SAUDI ARAMCO - Khurais Support Facilities Upgrade at Juaymah Gas Plant |
Gas Plant |
64000000 |
Prequalification |
| SAUDI ARAMCO - KPF (Khursaniyah Producing Facilities) |
Oil / Gas production |
4000000000 |
Construction |
| SAUDI ARAMCO - Manifa Field Development |
Offshore Oil / Gas Production |
7000000000 |
EPC Prequalification |
| SAUDI ARAMCO - Microwave Replacement & Backbone Upgrade - PH 1 |
Fiber Optic Network |
43000000 |
Awaiting Budget Approval |
| SAUDI ARAMCO - Nuayyim Field Development |
Field Development |
510000000 |
Bids Under Evaluation |
| SAUDI ARAMCO - PETRO RABIGH - Rabigh Refinery Expansion & Petrochemical Complex ( Overview) |
Refinery |
9900000000 |
Construction |
| SAUDI ARAMCO - PETRO RABIGH - Rabigh Refinery Expansion & Petrochemical Complex ( Power Plant) |
Power |
|
Construction |
| SAUDI ARAMCO - PETRO RABIGH - Rabigh Refinery Expansion & Petrochemical Complex (Offsites & Utilities) |
Refinery |
4300000000 |
Construction |
| SAUDI ARAMCO - PETRO RABIGH - Rabigh Refinery Expansion & Petrochemical Complex (Petrochemical Package) |
Petrochemical |
4300000000 |
Partially Awarded |
| SAUDI ARAMCO - PETRO RABIGH - Rabigh Refinery Expansion & Petrochemical Complex (Refinery Package) |
Oil refinery |
4300000000 |
Construction |
| SAUDI ARAMCO - Pipeline Rahabilitation Program 4 |
Pipeline |
60000000 |
EPC Bids Under Evaluation |
| SAUDI ARAMCO - Qatif Bulk Plant Upgrade |
Bulk Storage Plant |
26000000 |
Construction |
| SAUDI ARAMCO - Rabigh Refinery Control System Replacement |
Refinery |
35000000 |
Cancelled |
| SAUDI ARAMCO - Ras Tanura Integrated Refining & Petrochemical Project |
Refinery |
6000000000 |
Negotiations |
| SAUDI ARAMCO - Ras Tanura Refinery ESD & Marine Control System Replacement |
Oil Refinery |
23500000 |
Bids Under Evaluation |
| SAUDI ARAMCO - Rastanura & Juaymah Terminals Wastewater Treatment |
Waste Handling |
35000000 |
Detailed Engineering |
| SAUDI ARAMCO - Rastanura PSA Tail Gas Recovery Unit |
Oil Refinery |
26000000 |
Detailed Engineering |
| SAUDI ARAMCO - Rastanura Refinery Cogen Interconnection Facilities |
Cogeneration Plant |
195000000 |
Project Funding |
| SAUDI ARAMCO - Rastanura Refinery Cogeneration |
Oil Refinery |
|
Construction |
| SAUDI ARAMCO - Rastanura to Juaymah Gas Plant Pipeline |
Molten Sulphur Pipeline |
15000000 |
Project On Hold |
| SAUDI ARAMCO - Riyadh Refinery Debottlenecking and CCR Revamp |
Refining |
150000000 |
Feasibility Study |
| SAUDI ARAMCO - Riyadh Refinery Diesel Hydrotreating |
Diesel Hydro Desulphurisation (DHDS) |
183000000 |
Construction |
| SAUDI ARAMCO - Safaniya Disposal System Upgrade |
Water Distribution Network |
150000000 |
Contract Awarded |
| SAUDI ARAMCO - Safaniyah North Artificial Lift |
Offshore Oil Production |
400000000 |
EPC Contract Award |
| SAUDI ARAMCO - Safaniyah North Gas Gathering Pipelines |
Gas Gathering |
80000000 |
Awaiting Approval |
| SAUDI ARAMCO - Safaniyah TL-2 Scraping Facilities |
Oil Pipeline |
19000000 |
. |
| SAUDI ARAMCO - Shaybah Deep Cut Gas Plant to Abqaiq Gas Plant Pipelines |
Pipeline |
|
Planning |
| SAUDI ARAMCO - Shaybah Field Development |
Field Development |
1435000000 |
Bids Under Evaluation |
| SAUDI ARAMCO - Shaybah Gas Compression Upgrade |
Gas Processing |
33000000 |
Construction |
| SAUDI ARAMCO - Shedgum Gas Plant Cogeneration |
Gas Processing |
195000000 |
Construction |
| SAUDI ARAMCO - Shedgum to Yanbu NGL SHY-1 Pipeline Expansion (Phase 1) |
Oil Pipeline |
70000000 |
Construction |
| SAUDI ARAMCO - Shedgum to Yanbu NGL SHY-1 Pipeline Expansion (Phase 2) |
Pipeline |
150000000 |
SOI - Solicitation of Interest |
| SAUDI ARAMCO - Two Grades of Diesel Distribution at Jeddah |
Bulk Storage Plant |
22000000 |
. |
| SAUDI ARAMCO - Two Grades of Gasoline Requirements at ER Bulk Plants |
Bulk Storage Plants |
30000000 |
Detailed Engineering |
| SAUDI ARAMCO - Two Grades of Gasoline Requirements at WR Bulk Plants |
Bulk Storage Plants |
45000000 |
Construction |
| SAUDI ARAMCO - Uthmaniyah Gas Plant Cogen Interconnection Facilities |
Cogeneration Plant |
190000000 |
Project Funding |
| SAUDI ARAMCO - Uthmaniyah Gas Plant Cogeneration |
Gas Processing |
255000000 |
Construction |
| SAUDI ARAMCO - Uthmaniyah GOSPS 7,8 & 10Control Systems Upgrade |
GOSP |
|
Detailed Engineering |
| SAUDI ARAMCO - Uthmaniyah GOSPS 9,11&12 Control Systems Upgrade |
GOSP |
32000000 |
LSTK Bids Under Preparation |
| SAUDI ARAMCO - Yanbu Export Refinery |
Refinery |
5000000000 |
FEED Awarded |
| SAUDI ARAMCO - Yanbu Gas Plant Expansion |
Gas |
175000000 |
Construction |
| SAUDI ARAMCO - Yanbu Integrated Refining & Petrochemical Complex |
Refinery |
|
Planning |
| SAUDI ARAMCO - Yanbu Refinery CCR Platformer & Naptha Isomerisation |
Refinery |
100000000 |
Construction |
| SAUDI ARAMCO - Zuluf GOSP 2 Control System Replacement |
Offshore Oil / Gas Production |
28000000 |
Construction |
| SAUDI ARAMCO – Pipeline Loops for SHY-1 Expansion Phase - II |
Pipeline |
|
SOI - Solicitation of Interest |
| SAUDI ARAMCO – Pipeline Rehabilitation Program Phase 5 |
Pipeline |
|
SOI - Solicitation of Interest |
| SAUDI ARAMCO – Pipeline Upgrade for Area Classification Compliance Phase - II |
Pipeline |
|
SOI - Solicitation of Interest |
| SAUDI ARAMCO – RTR Mercury Removal Unit |
Gas Processing |
|
SOI - Solicitation of Interest |
| SAUDI ARAMCO – SHBAB -1 Capacity Expansion Project |
Pipeline |
|
SOI - Solicitation of Interest |
| SAUDI ARAMCO – Udhaliyah Sewage Treatment Plant. |
Sewerage Treatment Plant |
|
SOI - Solicitation of Interest |
| SAUDI ARAMCO/BAPCO - Oil Pipeline |
Oil Pipeline |
60000000 |
Feasibility Study |
| SAUDI CARBON COMPANY - Carbon Black Plant |
Carbon Black |
60000000 |
Construction |
| SAUDI CHEVRON PHILLIPS (SCP) - Aromatics Expansion |
Aromatics |
1000000000 |
Construction |
| SEC - Arar Power Plant Expansion |
Power Station |
86000000 |
EPC Bids Under Evaluation |
| SEC - Interconnection Lines - Hail - Al Jouf |
Transmission Lines |
126000000 |
Planning |
| SEC - Interconnection Lines - Hawiyah-Muzahimiyah |
Transmission Lines |
120000000 |
Planning |
| SEC - Interconnection Lines - Muzahimiyah-Bahra |
Transmission Lines |
670000000 |
Planning |
| SEC - Interconnection Lines - Qaisumah-Rafha |
Transmission Lines |
111000000 |
Planning |
| SEC - Interconnection Lines - Qassim-Madinah |
Transmission Lines |
670000000 |
Planning |
| SEC - Interconnection Lines - Shoaiba-Namera |
Transmission Lines |
106000000 |
Planning |
| SEC - Interconnection Lines - Shuqaiq-Muhayil- Namera |
Transmission Lines |
115000000 |
Planning |
| SEC - Interconnection Lines - Shuqaiq-Sabya-Asir |
Transmission Lines |
88000000 |
Planning |
| SEC - Interconnection Lines - Tabuk-Al Jouf |
Transmission Lines |
128000000 |
Planning |
| SEC - Interconnection Lines - Yanbu-Dhuba |
Transmission Lines |
152000000 |
Planning |
| SEC - Jizan Power Plant Expansion |
Power Generation |
85000000 |
Construction |
| SEC - Muzahimiyah Power Plant |
Power Generation |
750000000 |
Planning |
| SEC - Najran Power Plant Expansion |
Power |
100000000 |
Construction |
| SEC - Power Plant #10 |
Power Generation |
750000000 |
ITB |
| SEC - Qurayyah-II Power & Desalination Plant |
Power Generation & Desalination |
1900000000 |
Bids Under Preparation |
| SEC - Rabigh - II Power & Water Plant |
Power Generation |
1350000000 |
Prequalification |
| SEC - Rafah Power Plant Expansion |
Power Generation |
0 |
EPC Bids Under Evaluation |
| SEC - Riyadh PP9 Expansion |
Power |
800000000 |
EPC Contract Award |
| SEC - Shoaibah Phase II |
Power |
1032000000 |
Construction |
| SEC - Shuqaiq-III Power & Desalination Plant |
Power Generation & Desalination |
400000000 |
Planning |
| SEC - Sulbokh Power Plant |
Power Generation |
750000000 |
Planning |
| SEC - Tihama Power Plant Expansion |
Power Plant |
200000000 |
Planning |
| SEC - Yanbu-II Power & Desalnation Plant |
Power Generation & Desalination |
1400000000 |
Planning |
| SFFCL - Formaldehyde Complex Expansion |
Petrochemical |
|
Advanced Planning |
| SIPCHEM - Acetic Acid |
Production of Acetic Acid |
800000000 |
Planning |
| SIPCHEM - Ammonia Plant |
Ammonia |
200000000 |
PMC Bid Submission |
| SIPCHEM - GACIC - BDO/MAN Plant |
Butanediol & Maleic Anhydride |
380000000 |
Construction |
| SIPCHEM - Jubail Petrochemical Complex - Phase II Expansion (Acetyls Complex) |
Petrochemical |
800000000 |
Construction |
| SIPCHEM - Jubail Petrochemical Complex - Phase III Expansion |
Petrochemical |
|
PMC Bids Under Evaluation |
| SIPCO - Gulf Petroproduct Co - Linear Alkyl Benzene (LAB) |
N-Paraffin/Linear Alkyl Benzene |
250000000 |
Negotiations |
| SPC - Propylene & Polypropylene Expansion |
Propylene |
550000000 |
Detailed Engineering |
| SPCC - Majardah Clinker Plant |
Cement Plant |
240000000 |
Construction |
| SRAK - Rub Al Khali Field Development |
Gas |
|
Field Development |
| SRO - Mecca To Medina Rail Link |
Railway |
|
Planning |
| SRO - Saudi Landbridge Rail Link |
Railway |
5000000000 |
Tenders Issued |
| SWCC - Shuaiba Phase III Water Transmission System |
Power |
1000000000 |
Construction |
| SWCC - Shuqaiq Water Conveyance Project |
Water Conveyance System |
900000000 |
Bids Under Preparation |
| SWCC - Water Transmission Network Upgrade |
Water Transmission Lines |
900000000 |
EPC Bids Under Evaluation |
| TASNEE - Acetic Acid / VAM / Methanol Plant |
Petrochemical |
1000000000 |
Partially Awarded |
| TASNEE - Olefins Plant |
Olefins |
1500000000 |
Construction |
| TIHAMA - Saudi Aramco Independent Power Plants (IPP) |
Power |
550000000 |
Construction |
| UNICOIL - Phase II Expansion |
Cold Rolling Mill |
160000000 |
Construction |
| WEC - IWPP Jubail |
IWPP - Independent Water and Power Project |
1400000000 |
Planning |
| WEC - IWPP Ras Azzour |
IWPP - Independent Water and Power Project |
3000000000 |
Planning |
| WEC - IWPP Shoaiba |
Power Generation |
2450000000 |
Construction |
| WEC - IWPP Shuqaiq |
Power |
400000000 |
Bids Under Evaluation |